A pool and spa on a hillside deck at sunset, with loungers under white umbrellas and the valley spread out below

Pools & Spas in Glendale

Custom Pool Design and Build in Glendale

Pool and spa design and build for Glendale's hillside and foothill lots, from Rossmoyne and Adams Hill to the Verdugo canyons. The retaining, the drainage and the access get worked out first, and the pool is drawn together with the terraces, planting and lighting around it.

25+ years of experience
10,000+ projects completed
In-house design-build crews

Pools in Glendale

What shapes a pool in Glendale

Most Glendale backyards are not flat. In Rossmoyne, Verdugo Woodlands, Adams Hill and the canyons, the ground falls away from the house, and the level pad a pool needs has to be built rather than found. Retaining and grading are usually the first lines on the plan, and often the largest.

The slope is also where the water goes. Glendale sits on the alluvial fan below the Verdugo Mountains, so a hillside yard collects runoff from everything above it, and a large share of the city sits in a Very High Fire Hazard Severity Zone with annual brush clearance inspections. Both get designed in alongside the pool.

  • Building the level pad

    Retaining walls do the real work on a Glendale lot. We size and step them with the pool layout, keeping wall heights within what the city will approve without an oversized engineering exercise.

  • Foothill storm water

    Runoff arrives from uphill, not just from the roof. Catch basins, solid pipe to an approved outlet and deck grades that carry water away from the shell and the wall footings are planned before anything is poured.

  • Brush clearance around the water

    In the hillside zones the planting plan has to pass an annual inspection. We keep the first five feet around the house clear, use irrigated low planting near the pool and the structure, and let the deck and spacing break up continuous fuel.

  • Access and equipment

    Steep driveways and narrow side yards decide how the excavator, the shotcrete and the materials reach the yard. We plan access, staging and where the pool equipment can sit and be serviced during design, not on delivery day.

Nearby communities we serve: La Crescenta, Montrose, Eagle Rock, Burbank, Pasadena

Pool styles

Six ways a pool can be built

Modern, Freeform, Formal, Infinity edge, Fiberglass, Pool and spa. Pick one to see who it suits, what it asks of the property, and a project where we built it.

A modern rectangular pool with a raised spa, tiled edge and an outdoor kitchen behind it
Built at Skyline Sanctuary

Modern pools

Best for Contemporary and mid-century houses, and anyone who wants the pool to look built rather than dropped in.

  • Straight runs and square corners line up with the house and the paving
  • Takes a raised spa and spillway as part of the structure, not an add-on
  • Tile, coping and deck line up when they share an edge

On your property Needs a level or terraced area. On a slope the cost is in the retaining that makes the level, not in the pool.

  • Raised spa with spillway
  • Sun shelf
  • Linear fire feature
  • Large-format paving

One coordinated team

We design the whole environment, not the pool shell

Everything marked here is in this one photograph, and the same company drew and built all of it. So are the cabana, outdoor kitchen and fire table just outside the frame. A pool builder gives you a pool. This is the rest of it.

A rectangular pool with a stone-clad raised spa, sheer descents falling from a tiled wall, concrete decking with turf joints and a glass safety fence

Shown: Entertainer's Cabana, Simi Valley

How a pool gets built

Concept to completion

The five stages below are the pool version of the same five-step design process we run on every project.

  1. The property before construction, showing the existing dry creek and mature trees Before: the yard as we found it

    Site and property analysis

    Somebody comes out and measures. Grade, boundaries, setbacks, trees worth keeping, and where the panel, meters, valves and drains actually sit. On a pool that survey decides where the excavation can go before anything gets drawn.

  2. The measured base plan of the property, showing levels, boundaries and existing trees Base plan

    Pool and backyard concept

    The pool, the deck around it and the planting get drawn together, same scale, same sheet. This is where the yard either works as one space or it does not.

  3. Pallets of tile and building materials stacked on racking at a supply yard Materials

    Materials, engineering and selections

    Coping, waterline tile, interior finish, decking and equipment all get picked against samples. Structural work like retaining and sections through a slope gets engineered at this stage, not discovered later.

  4. A 3D rendering of the pool and terrace used to agree the scheme before permitting 3D rendering

    Permitting and construction

    Permits go through our own permitting department. Then excavation, steel, plumbing, shotcrete, decking and finish, with a supervisor on site and a different trained crew for each trade.

  5. The finished pool with boulder coping, flagstone decking and planted slopes Finished

    Finishing and final walkthrough

    Planting, lighting and equipment start-up, then a walkthrough on how the system runs and what it needs. Plants get a monitoring period after that.

Featured project

A tiered backyard quieted down into a spa-first retreat, with a linear fire feature, turf-to-paver terracing and a clear look out across the valley. More pairs like this are in our before-and-after archive.

Before your consultation

The decisions that shape a pool

You do not need answers to these before you call. Knowing what the questions are makes the first conversation a lot more useful.

  • Shape and size

    The yard decides more of this than taste does. Setbacks, equipment access, the fall across the site and how much room you want left around the water all narrow it before style comes into it.

  • Concrete or fiberglass

    Concrete is formed on site in shotcrete, so the shape is yours and the build takes longer. Fiberglass comes as a molded shell in a fixed size. Quicker, but it has to physically reach the hole.

  • Integrated spas

    Raised, flush or spilling. Sharing equipment with the pool costs less to build and less to run than a separate hot tub, but the structure has to be drawn in from the start.

  • Coping and waterline tile

    The two details you look at most and touch most. They decide whether the pool looks modern or traditional more than the outline does.

  • Sun shelves, steps and seating

    A baja shelf is somewhere to sit in a few inches of water. Benches and wide steps add usable space without adding depth.

  • Heating and water systems

    Heating decides whether the spa gets used in January. Saltwater runs a chlorine generator instead of buying chlorine, and it can go on any of these pool types.

  • Pool lighting

    Lights in the water, and lights on everything around it. Running the conduit with the rest of the work is the only way to get fixtures where you want them.

  • Safety and permitting

    Barrier and drain requirements are set by code. Glendale runs its own Building and Safety department, and on hillside lots in Chevy Chase Canyon, Verdugo Woodlands and Glenoaks Canyon, grading, retaining wall and indigenous tree review can come on top of the pool permit. We pull the permits in house and work through plan check, so the approval path is clear before a crew mobilizes.

Investment & schedule

What shapes your pool investment and timeline?

A pool is shaped by the property it goes into: the design, the access, the engineering and how much of the yard around it is in scope. We settle those during design, so you are deciding with the site in front of you rather than a guess.

No quote written off a photograph can account for what your property is like.

What shapes the investment

  • Pool size, depth, shape and structural complexity
  • Excavation access, grading and any retaining the site needs
  • Coping, tile, interior finish and the decking around it
  • Spa, heating, lighting, water features and automation
  • How much of the surrounding landscape is in scope

What shapes the schedule

  • Design development and the engineering it calls for
  • City of Glendale permit review, with grading, retaining wall and indigenous tree review on hillside lots
  • Site access for excavation, equipment and materials
  • Hillside and complex lots that need structural work
  • Material selections, weather and construction sequencing

Why the pool and the yard are drawn together

Decking, drainage, utilities, planting, shade, lighting and where people actually sit all bear on where the pool goes and how it gets built. Settling them on one set of drawings is what keeps conduit out of the wrong trench and stops paving being cut to fit afterwards.

  • Pool and spa Shell, structure, plumbing and the equipment that runs them.
  • Decking and grade Levels, joints and where water goes once the deck sheds it.
  • Drainage and utilities Gas, water, power and conduit, set before anything is poured.
  • Planting and privacy Screening, shade and what will tolerate growing next to a pool.
  • Lighting and entertaining Circuits, seating and the parts of the yard that get used after dark.
A hand-annotated site plan for the whole property, with the pool and spa, plumbing and equipment, planting and lighting all noted on one sheet
The design sheet: pool and spa, plumbing, planting and lighting
An overhead view of the finished backyard in the evening: the pool and raised spa lit from within, concrete deck panels separated by turf joints, umbrellas over the seating, a lit pergola beside the cabana and a planting bed along the rear wall
The same yard built: Entertainer's Cabana, Simi Valley

Access, engineering, permits, finishes and scope vary a lot from one property to the next, so the investment and the schedule for a pool are set once we have seen the site and the design is settled.

Tell us about the property and what you want the yard to do. We will walk through the design, site and permitting factors likely to shape it.

What homeowners say

Reviews from pool projects

  • The yard had flooding, an aging pool finish, old irrigation, and an unusable layout-a list of problems we felt overwhelmed by. Pacific Outdoor Living helped turn those problems into a complete new design that transformed our space. The new layout is beautiful, functional, and finally usable year-round.

    Tom W. Google review Pool finish, drainage and full redesign
  • We are thrilled with our new backyard. Our pool, spa, and firepit feel like a resort, and the work was professional, clean, on time, and priced well. The entire POL team made the construction process easy and manageable, keeping us informed every step of the way. We couldn't have asked for a better experience.

    Mary P. Yelp review Pool, spa and fire pit
  • The pool, spa, and patio renovation turned out beautifully, and the custom waterslide became a favorite feature for the family. Our kids absolutely love it, and it's become the gathering spot for our entire neighborhood. The quality of the work and attention to creating a family-friendly space was exceptional.

    Monty Richards Google review Pool, spa, patio and custom waterslide
  • They completely remodeled our pool, added a hot tub, and handled all the lighting and landscaping. Our project supervisor, Juan, demonstrated great communication and meticulous attention to detail, taking extra care to ensure that every aspect was safe for our kids and our puppy. This is clearly a company that takes genuine pride in their work.

    Sarah Johnson Google review Pool remodel, hot tub, lighting and landscaping
  • Our backyard transformation into a tiki oasis by Pacific Outdoor Living was nothing short of extraordinary! Julian Montford's design expertise and Trent Morrill's impeccable coordination made this project an absolute pleasure from start to finish. The 500 square foot pavilion and tiki hut added an enchanting touch, while the refurbished built-in pool became the centerpiece of our newfound paradise.

    Tomas Costanza Google review · 2 years ago Pool remodel, pavilion and tiki hut
  • Pacific Outdoor Living gets a 5 star review because of their outstanding customer service and job performance. We recently renovated our backyard with an in-ground pool and outdoor space. The job took no more than two and a half months to complete. Samantha the designer, worked with us to sketch exactly what we wanted and provided us with a 3D model of how our backyard would look like. It came out exactly what was sketched.

    Macky Goldscher Google review · a year ago In-ground pool and outdoor space
  • They did exactly what they promised with amazing quality and fast timing. My project manager Khalil was a pleasure to work with, and the team demonstrated exceptional professionalism and craftsmanship.

    Lori Nelson Google review Pool and hardscape

Read all Pacific Outdoor Living reviews on Google

Questions

Pool design and construction, answered

Can you build a pool on a steep Glendale lot?

Yes. Hillside pools are a large share of our work. The planning items are how much retaining the pad needs, how equipment reaches the yard, where the pool equipment can sit and be serviced, and how the plumbing and electrical cross the grade. We resolve those in design, with the grades shot and the section drawn, rather than during excavation.

Our yard floods in winter. Should that be fixed with the pool?

It should be fixed as part of the same project. Regrading, area drains and properly routed solid pipe cost far less to install while the yard is already open than to add afterward, and a pool deck built over an unresolved drainage problem will not last.

How does brush clearance affect the planting around a pool?

It shapes the zone closest to the house more than the rest of the yard. The first five feet stay clear of combustible material, the near zone is planted low and irrigated, and hardscape and spacing break up continuous fuel. Further out, toyon, coffeeberry, sages, ceanothus and native grasses handle Glendale's heat on drip irrigation.

How long does pool design and construction take?

The design stage generally runs two to five weeks depending on the size of the project and how many revisions it goes through. Construction varies with scope: small jobs can be a week, and large projects can run three to six months. Your designer and job supervisor give you a firmer timeline once the design is complete.

Can you remodel an existing pool?

Yes. Pool remodeling is one of the services we offer, and several of the projects in our portfolio kept the existing pool shell and rebuilt it with new tile, coping and plaster along with the deck and planting around it.

Can the patio and landscaping be built at the same time?

Yes, and it is the reason the company is set up the way it is. We design and build the pool, hardscape, carpentry, planting and lighting with our own crews, so the same team is responsible for how those pieces meet.

Do you design fiberglass and concrete pools?

Yes. Concrete pools are formed on site in shotcrete, which lets the shape be drawn to the yard. Fiberglass pools arrive as a molded shell in a fixed size and shape, which shortens the wet trades but depends on the shell being able to reach the excavation.

Can I see the project in 3D before construction?

Yes. The design fee covers site measurements, an illustrated design, a 3-D design and revisions as needed, so you see the layout and the materials before anything is built.

How much does a luxury backyard with a pool and outdoor kitchen cost?

A complete outdoor living environment involves more than individual features, so pool and outdoor kitchen cost depends on how the whole yard comes together. On the pool, the price moves with size and depth, how much grading or retaining the site needs, the coping, tile, interior finish and decking, and whether there is a spa, heating, water features or automation. On the kitchen, it moves with counter length, appliances, and the gas and electrical runs. We design the pool, kitchen, patios, lighting, and landscaping as one cohesive space, so every element complements the others and you have a clear understanding of the overall investment before construction begins.

How do I find a contractor experienced with my type of project?

Look at completed projects, not just conceptual designs, and look for ones like yours: a similar architectural style, a similar lot, the same features. Our portfolio covers a broad range of outdoor environments, from hillside pools and full backyard remodels to courtyards, outdoor kitchens, and drought-tolerant gardens. Evaluate the finished work and the details that bring a design to life.

How do I compare estimates from landscape contractors?

Not all estimates represent the same scope or level of craftsmanship. Compare materials, construction methods, specifications, allowances, and overall project completeness, not just the final price. A low number built on vague allowances tends to come back later as change orders. Estimates priced from a measured, detailed design are the easiest to compare line for line.

Do I need a permit to build a pool in Glendale?

Yes. A new pool or spa needs a building permit, and the gas, electrical, and any retaining walls around it can need approvals of their own. Requirements vary by city, so our in-house permitting department maps them during design and typically pulls every permit the job needs. You do not have to take time off work to queue or work out the requirements yourself.

Do you build pools in Glendale?

Yes. Glendale is well inside our Greater Los Angeles service area, and our Sun Valley yard and showroom are roughly fifteen minutes away. Use the address checker on our Glendale page to confirm coverage for your exact property.

See everything we build in Glendale

Let's build your dream outdoor space, so you can build beautiful memories.

Tell us how you want the backyard to look and work. We will walk you through the right pool design, the scope and what happens next.

What happens next: we set up a visit, measure the property and talk through what you want the yard to do. Then you get a design to look at before you commit to anything.