Our Process

The Process That Keeps Your Project On Track

Before we build, we measure, plan, design, price, and coordinate the details that can make or break an outdoor living project.

  • Prevents costly surprises
  • Aligns design with budget
  • Builds with confidence

Why this matters

Most Project Overruns Start Before Construction Begins

A buildable plan helps homeowners move from uncertainty to clarity. When measurements, elevations, drainage, materials, and scope are understood early, the budget is less likely to change later for avoidable reasons.

Without a clear process

  • Guesswork on measurements
  • Budget surprises later
  • Design changes during construction
  • Delays from missing details
  • Stress for the homeowner

With POL's 5-step process

  • Accurate site analysis
  • Scope and pricing reviewed early
  • Design decisions made before construction
  • Crews start with a clear plan
  • Clear communication and next steps

The 5-step process

Planning First, Building With Confidence

Each step narrows the unknowns before construction begins, so your outdoor living project can move from idea to build plan with fewer avoidable surprises.

Step 01

Site Analysis

We measure the property before we design.

What happens

Our team documents existing property conditions using a Leica LiDAR scanner alongside precise field measurements, capturing elevations, drainage, access, utilities, structures, hardscape, and other site details for your designer.

Why it matters

The design starts with real information instead of assumptions.

How it saves money

Accurate site data helps avoid redesigns, drainage mistakes, grading issues, and unexpected construction changes.

Step 02

Designer Meeting

We shape the vision around your goals and budget.

What happens

Your designer uses the site analysis to begin shaping a plan for how you want to live outside.

Why it matters

The project direction is guided by both creativity and buildability.

How it saves money

Early budget conversations help prevent designing a project that looks great but is unrealistic to build.

Step 03

Conceptual Design

We refine the layout, materials, and project direction.

What happens

Layouts, materials, planting, hardscape, and major features are reviewed together so the outdoor space feels cohesive.

Why it matters

The project becomes more specific before construction decisions are locked in.

How it saves money

Decisions made here reduce last-minute material changes, redesigns, and delays later.

Step 04

3D Renderings and Final Plan

You see the project before construction begins.

What happens

3D renderings help you understand the finished space before committing to construction.

Why it matters

You can make confident decisions before crews are scheduled and materials are ordered.

How it saves money

It is much less expensive to adjust a design on screen than after construction has started.

Step 05

Construction

Our team builds from a clear plan.

What happens

The designer, job coordinator, and in-house crews are aligned on the plan, scope, materials, and schedule.

Why it matters

Everyone starts construction with the same expectations and direction.

How it saves money

A clear build plan reduces confusion, rework, delays, and miscommunication.

The cost of skipping planning

Skipping Planning Does Not Save Money. It Usually Moves the Cost Later.

A rushed estimate may feel faster upfront, but if the property is not measured correctly, drainage is misunderstood, or materials are not selected early, the real cost often appears during construction. That is when changes become more expensive.

Redesigns

When measurements or site conditions are wrong, the plan may need to be redrawn after decisions have already been made.

Change Orders

When scope, materials, or site constraints are unclear, new costs can appear after construction is underway.

Delays

When selections, permits, access, or construction details are not aligned early, the schedule is easier to disrupt.

The process in practice

See the 5-Step Process Come to Life

This project began with a challenging site and several outdoor-living goals. See how accurate site information, thoughtful design development, and clear construction planning shaped the finished space.

Existing yard conditions before design beganExisting backyard mid-construction with hardscape and built-in grill island before design began
The design team meeting with the homeowner to review renderings and plans
Conceptual outdoor living plan for the project
3D rendering of the finished outdoor living space3D rendering of the pool, spa, and covered outdoor kitchen3D rendering of the covered lounge with fireplace, TV, and bar seating next to the pool
The finished outdoor living spaceThe finished pool, spa, and stone waterfall feature at duskThe finished covered outdoor kitchen and lounge with pizza oven, TV, and fireplace

Step 1 of 5

Site Analysis

Documenting the real site conditions

The team measured elevations, drainage, access, and existing structures on this property using a Leica LiDAR scanner, giving the designer a precise, to-scale record of the site before any design work began.

Deliverable

A complete site survey, existing-conditions report, and a 3D LiDAR scan of the property, yours to keep for future projects.

Why it matters: The design starts with real information instead of assumptions.

Questions homeowners ask

Process FAQ

Why do I need a site analysis before getting a final price?

A final price depends on real property conditions. Measurements, elevations, drainage, access, utilities, and existing structures can all affect the plan and the cost. The site analysis helps us price the actual project instead of guessing from a quick look.

Does the design process add cost?

The process is an upfront planning investment that helps clarify scope, materials, and build details before construction begins. It can help reduce avoidable redesigns, unclear allowances, and expensive decisions made too late.

Can you just give me a quick estimate?

We can discuss a general range, but a quick estimate is not the same as a build-ready plan. For meaningful pricing, the property needs to be measured, the scope needs to be defined, and the design needs to be aligned with the budget.

What happens if my budget does not match my wish list?

That conversation happens early. Your designer can help prioritize the most important parts of the project, phase the work when appropriate, or adjust materials and scope so the plan is more realistic.

Why is 3D important?

3D renderings help you understand scale, layout, materials, and how the finished space will feel. It is easier to make changes on screen than after crews are scheduled and materials are ordered.

How does this process help prevent change orders?

Change orders often happen when details are missing or assumptions are wrong. By measuring first, reviewing scope early, selecting materials, and coordinating the construction plan, the process helps reduce avoidable surprises.

Who manages the project during construction?

Your designer, job coordinator, and in-house crews work from the same plan. The job coordinator becomes your point of contact during construction and helps keep communication clear as the project moves forward.

Start smarter

Start With a Plan That Protects Your Project

Tell us about your property, your goals, and how you want to use the space. We'll help you understand the right next step.

Schedule Your Consultation